Integrated climate platform

Preparation

To sharpen the challenge, the project was guided by PwC/3E from May to November 2018. The market consultation took place on 27 August 2018. The results of this market consultation will determine the final approach, including the tender process, and provide input for the drafting of the tender document.

The results of the needs assessment and market consultation are included in the report, which can be found at the bottom of the page under documents. 
The presentations of the market consultation are available at the bottom of the page under documents.